Photo Gallery
July 21, 2000 Completed Pictures
June 16, 2000 Final Inspections!!!!
June 7, 2000 More T & G, Shower installed, and trim work
May 30, 2000 Ceiling T & G, Tile, Porch, and Roof Shingles
May 23, 2000 Porch, Tile and more trim
May 14, 2000 Wall coverings, Doors, Drywall and more
May 10, 2000 Doors, Windows, Cabinets and More
April 29, 2000 Interior work begins, tongue and groove.
April 26, 2000 Sub Contractors Complete their work
April 26, 2000 Septic System, Deck, Stairs, and Porch Ceiling
April 9, 2000 Stud Walls, Electrical wiring, plumbing, oh my!
April 6, 2000 Workers…working.
April 3, 2000 PREVIEW: What the Lot Looked like before building
April 3, 2000 Stud Walls, and Roof Dry-in
March 18, 2000 More Roof work
March 11, 2000 Roof Sheathing and Porch Roof
March 5, 2000 Roof Framing and Porch
February 26, 2000 The Gable Ends
February 19, 2000 The Gable ends and Porch
February 19, 2000 The Beam System
February 11, 2000 The First Floor
February 6, 2000 Termite Sheild and Sub-Floor
January 8, 2000 Our Storage Shed
January 8, 2000 Wood Rotting at the job site
January 1, 2000 The Slab and Crawlspace
December 19, 1999 Casual Pictures
December 19, 1999 More Foundation Footers and Blocks
November 30, 1999 Foundation Footer
November 13, 1999 Temorary Electric Pole and Permit Pole
November 5, 1999 Preparing the Foundation
November 5, 1999 The Trucks Arrive
November 5, 1999 Unloading the Trucks Part 1
November 5, 1999 Unloading the Trucks Part 2